Home Page Join Our Newsletter Follow Us Like Us LinkedIn
TUESDAY, OCTOBER 26, 2010

Natomas levees bolstered, but work far from finished

Sacramento's flood-threatened Natomas basin will meet the coming winter with some of the strongest levees in California, thanks to two solid years of earnest earthmoving. 

But the job is far from done. A major portion of levee work in federal hands could take years longer to complete than anticipated. As a result, a mandatory flood insurance requirement affecting the 80,000 residents of the basin could remain in place until at least 2014.
Read more: http://www.sacbee.com/2010/10/26/3131522/natomas-levees-bolstered-but-work.html#ixzz13TioqsZI

To get your free flood quote to be protected click Flood Quote Form.

Posted 10:19 AM  View Comments

Share |


No Comments


Post a Comment
Name
Required
E-Mail
Required (Not Displayed)
Comment
Required


All comments are moderated and stripped of HTML.
Submission Validation
Required
CAPTCHA
Change the CAPTCHA codeSpeak the CAPTCHA code
 
Enter the Validation Code from above.
Blog Archive


View Mobile Version
Home Page About Us Get A Quote Referrals Contact Us Insurance Broker Website Templates by Insurance Website Builder